x

A previous renovation was completed in the mid 70’s but had some major flaws. We resolved these with some strategic briefing sessions that gave us a good understanding of what the client wanted. The first move was to reintroduce a formal entry area that will be used day to day. Next was to embrace the existing split levels rather than hide them; this increased the connection between all the spaces. Finally, the whole interior space was integrated with the outdoor terrace area through material and level changes.

Construction commencing soon.

0093 3D terrace upper
0093 3D parking upper
0093 3D kitchen upper
0093 3D living upper